AD/EC 120/11 - Tail Rotor Drive Shaft Damper

Administered by Department of Infrastructure, Transport, Regional Development, Communications, Sport and the Arts

Legislation au F2006B09307 In force Legislative Instrument

Legislation content

COMMONWEALTH OF AUSTRALIA (Civil Aviation Safety Regulations 1998), PART 39 - 105 CIVIL AVIATION SAFETY AUTHORITY

SCHEDULE OF AIRWORTHINESS DIRECTIVES

 


AIRWORTHINESS DIRECTIVE


For the reasons set out in the background section, the CASA delegate whose signature appears below issues the following Airworthiness Directive (AD) under subregulation 39.1 (1) of CASR 1998. The AD requires that the action set out in the requirement section (being action that the delegate considers necessary to correct the unsafe condition) be taken in relation to the aircraft or aeronautical product mentioned in the applicability section: (a) in the circumstances mentioned in the requirement section; and (b) in accordance with the instructions set out in the requirement section; and (c) at the time mentioned in the compliance section.


 

Eurocopter EC 120 Series Helicopters

 

AD/EC 120/11 Tail Rotor Drive Shaft Damper 2/2004

DM

Applicability: EC 120B model helicopters all serial numbers up to and including 1362. Requirement:              Inspect the tail rotor drive shaft damper for correct installation in accordance with

Eurocopter Alert Telex Number 65A004.

 

Note: DGAC Airworthiness Directive U F-2003-465 refers

 

Compliance: Unless previously accomplished:

 

  1. Helicopters having less than 500 flying hours time in service since new; prior to exceeding 550 flying hours time in service since new.

 

2.         Helicopters having more than 500 flying hours time in service since new; within 50 flying hours time in service from the effective date of this directive.

 

This Airworthiness Directive becomes effective on 14 January 2004.

 

Background: This directive has been issued in response to a report of a tail rotor drive shaft damper being found incorrectly assembled. The damper half clamps were found to be fouling and scoring the drive shaft. Continued operation of the helicopter in that condition may have resulted in the failure of the drive shaft.


David Villiers

Delegate of the Civil Aviation Safety Authority 7 January 2004

 

 

 

 

 

 

 

The above AD is notified in the Commonwealth of Australia Gazette on 14 January 2004.

 

 


Page 1 of 1

Overview

The Civil Aviation Safety Regulations 1998, enacted by the Commonwealth of Australia, serve to regulate civil aviation safety across the country. This legislation provides the framework for ensuring that all aircraft and aeronautical products meet necessary safety standards. A specific gap addressed by the Civil Aviation Safety Regulations is the need for consistent and stringent safety standards for aircraft and aeronautical products to prevent accidents and ensure the safety of passengers and crew. This is achieved through various mechanisms, including Airworthiness Directives issued by the Civil Aviation Safety Authority (CASA). The policy objective of these regulations is to maintain and enhance the safety of civil aviation through rigorous oversight and enforcement of safety standards. One such instance of this regulatory action is the Airworthiness Directive AD/EC 120/11 issued by the Civil Aviation Safety Authority in January 2004. This directive targets the Eurocopter EC 120 Series Helicopters, specifically addressing an issue with the tail rotor drive shaft damper. The directive mandates inspections and corrective actions to prevent unsafe conditions, such as improper installation of the damper, which could lead to drive shaft failure. This action was taken in response to a reported incident where a tail rotor drive shaft damper was found incorrectly assembled, highlighting the necessity for stringent safety measures to prevent potential accidents. The directive was issued under subregulation 39.1 (1) of the Civil Aviation Safety Regulations 1998 and became effective on 14 January 2004, underscoring the continuous commitment to aviation safety by the Australian regulatory body.

Scope and Application

The Civil Aviation Safety Regulations 1998, specifically Part 39, covers a range of safety directives including the Airworthiness Directive (AD) for the Eurocopter EC 120 Series Helicopters. This AD applies to all EC 120B model helicopters with serial numbers up to and including 1362, focusing on the inspection and correct installation of the tail rotor drive shaft damper. The directive is intended to address a specific safety concern identified through the report of a tail rotor drive shaft damper being incorrectly assembled, which could potentially lead to a failure of the drive shaft. The AD mandates that inspections be carried out in accordance with Eurocopter Alert Telex Number 65A004, with different compliance timelines based on the number of flying hours since the helicopter was new. For helicopters with less than 500 flying hours, the inspection must occur before exceeding 550 flying hours, while those with more than 500 flying hours must undergo the inspection within 50 flying hours from the directive's effective date of 14 January 2004. This AD is issued under the authority of a delegate of the Civil Aviation Safety Authority and applies across the Commonwealth of Australia, ensuring that all relevant aircraft meet the specified safety standards.

Key Provisions

The main operative sections of this Airworthiness Directive (AD) (CASR 1998) pertain to the requirements for inspecting the tail rotor drive shaft damper on specific EC 120B model helicopters. According to section 1, the AD mandates that the tail rotor drive shaft damper of these helicopters must be inspected to ensure correct installation. This inspection must be conducted in accordance with Eurocopter Alert Telex Number 65A004. The directive applies to EC 120B model helicopters with all serial numbers up to and including 1362. The requirement section specifies that this inspection must be completed before certain flying hour milestones are reached: for helicopters with less than 500 flying hours since new, the inspection must occur before exceeding 550 flying hours, and for helicopters with more than 500 flying hours, it must occur within 50 flying hours from the directive’s effective date. The AD imposes specific obligations on the parties or entities it governs. Operators of the affected EC 120B model helicopters must ensure that the tail rotor drive shaft damper is inspected according to the prescribed method and within the stipulated time frames. This involves adhering to the detailed instructions outlined in Eurocopter Alert Telex Number 65A004. Failure to comply with these inspection requirements can lead to unsafe conditions that might result in the failure of the drive shaft, which poses significant safety risks. The directive further necessitates that the inspection be carried out by qualified personnel who are familiar with the Eurocopter Alert Telex instructions and have the necessary technical expertise to conduct the inspection correctly. Breach of the AD can result in significant legal consequences. Under section 39.1(1) of CASR 1998, non-compliance with an Airworthiness Directive can be considered a breach of the regulations, potentially leading to civil or criminal penalties. The specific penalties for breaches of such directives are not detailed in this particular AD but can generally include fines or other sanctions. The exact penalties would be determined based on the nature and severity of the non-compliance, as well as any resulting harm or risk. It is crucial for operators to ensure strict adherence to the AD to avoid any legal repercussions or safety incidents.

Legal classification tags

Area of Law
Aviation Law
Instrument
Legislative Instrument
Concepts
Definitions & Interpretation
Enforcement Powers
Compliance Obligations

Interactions

Authorises

All Versions

Sourced from the Federal Register of Legislation at 26 August 2026. For the latest information on Australian Government law please go to https://www.legislation.gov.au.