AD/CESSNA 177/16 - Oil Pressure Gauge Line

Administered by Department of Infrastructure, Transport, Regional Development, Communications, Sport and the Arts

Legislation au F2006B05010 In force Legislative Instrument

Legislation content

COMMONWEALTH OF AUSTRALIA (Civil Aviation Regulations 1998), PART 39 - 105 CIVIL AVIATION SAFETY AUTHORITY

SCHEDULE OF AIRWORTHINESS DIRECTIVES

 


Cessna 177 Series Aeroplanes

 

AD/CESSNA 177/16 Oil Pressure Gauge Line 3/74

Applicability: Model 177 with S/Nos. 17700001 to 17701160.

 

Requirement: 1. Inspect the oil pressure gauge line along the entire length from firewall to instrument panel, paying particular attention to the following areas:

 

(a)     in the vicinity of the flap control switch;

 

(b)     adjacent to the blast cooling nozzle of those aircraft fitted with radio cooling equipment.

 

2. Adjust the line as required to prevent chafing. Compliance: Within 100 hours time in service after 29 March 1974.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Interactions

Authorises

All Versions

Sourced from the Federal Register of Legislation at 26 August 2026. For the latest information on Australian Government law please go to https://www.legislation.gov.au.