AD/BEECH 1900/9 - Electrical Power - Hot Battery Bus

Administered by Department of Infrastructure, Transport, Regional Development, Communications, Sport and the Arts

Legislation au F2006B03667 In force Legislative Instrument

Legislation content

COMMONWEALTH OF AUSTRALIA (Civil Aviation Regulations 1998), PART 39 - 105 CIVIL AVIATION SAFETY AUTHORITY

SCHEDULE OF AIRWORTHINESS DIRECTIVES

 


Beechcraft 1900 Series Aeroplanes

 

AD/BEECH 1900/9 Electrical Power - Hot Battery Bus 13/94

DM

 

Applicability: Model Serial Numbers

 

1900 UA-2 and UA-3

 

1900C UB-1 to UB-74 and UC-1 to UC-174 both inclusive 1900D  UE-1 to UE-87 inclusive

Requirement: Action in accordance with Beechcraft Mandatory Service Bulletin 2562 dated August 1994.

 

Note: FAA AD 94-20-05 Amdt 39-9033 refers.

 

Compliance: Within 50 hours time in service from 19 October 1994.

 

Background: Beechcraft have advised the FAA that they received a report of the hot battery bus bar wrongly installed on the lower (load) side of the hot battery bus fuse assembly in a Beech 1900 series aircraft (correct installation is on the upper (power) side of the circuit). This incorrect installation does not provide adequate overload protection to circuits connected to the hot battery bus, this condition if not detected and corrected could result in loss of all electrical power to all emergency equipment connected to the hot battery bus. Inspections and modification of the electrical circuit required by this Directive will ensure adequate overload protection of circuits connected to the hot battery bus.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Interactions

Authorises

All Versions

Sourced from the Federal Register of Legislation at 26 August 2026. For the latest information on Australian Government law please go to https://www.legislation.gov.au.