AD/B767/74 - Hydraulic Power - Ram Air Turbine Wiring

Administered by Department of Infrastructure, Transport, Regional Development, Communications, Sport and the Arts

Legislation au F2006B03429 In force Legislative Instrument

Legislation content

COMMONWEALTH OF AUSTRALIA (Civil Aviation Regulations 1998), PART 39 - 105 CIVIL AVIATION SAFETY AUTHORITY

SCHEDULE OF AIRWORTHINESS DIRECTIVES

 


Boeing 767 Series Aeroplanes

 

AD/B767/74 Hydraulic Power - Ram Air Turbine Wiring 4/94

Applicability: Model 767 series aeroplanes listed in Boeing Service Bulletin 767-29-0021 Revision 4 dated 12 May 1988.

 

Requirement: Unless previously accomplished; replace the Ram Air Turbine (RAT) airspeed switch; cap and stow the wire between the RAT airspeed switch and the air/ground relay and then perform a functional test of the RAT deployment system; in accordance with Boeing Service Bulletin 767-29-0021 Revision 4 dated 12 May 1988.

 

Note: FAA AD 94-01-02 Amdt 39-8784 refers.

 

Compliance: Prior to 30 June 1995 or within 4000 hours time in service after 31 March 1994, whichever occurs later.

 

Background: The aircraft manufacturer has received reports of the RAT airspeed switch relay chattering during take-off and landing. Although the relay is designed and tested to cycle in excess of one million times, it was only expected to cycle once each flight, therefore the switch may fail due to excessive cycling.

 

If the failed switch remained in the open position the RAT may not automatically deploy, leading to a possible loss of hydraulic power. Compliance with this Directive is intended to prevent the inability to maintain hydraulic system power in the event that power is lost in both engines.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Interactions

Authorises

All Versions

Sourced from the Federal Register of Legislation at 26 August 2026. For the latest information on Australian Government law please go to https://www.legislation.gov.au.