AD/B737/99 - Main Rudder Power Control Unit (PCU)

Administered by Department of Infrastructure, Transport, Regional Development, Communications, Sport and the Arts

Legislation au F2006B02999 Not in force Legislative Instrument

Legislation content

COMMONWEALTH OF AUSTRALIA (Civil Aviation Regulations 1998), PART 39 - 105 CIVIL AVIATION SAFETY AUTHORITY

SCHEDULE OF AIRWORTHINESS DIRECTIVES

 


Boeing 737 Series Aeroplanes

 

AD/B737/99 Main Rudder Power Control Unit (PCU) 1/97

Applicability: All Boeing 737 models.

 

Requirement: 1. Perform a test on the main rudder power control unit (PCU) in accordance with Boeing Alert Service Bulletin (ASB) 737-27A-1202 dated 01 November 1996 to verify proper operation.

 

2. If, as a result of Requirement 1, the test gives unusual results as described in the referenced ASB, replace the main rudder PCU and perform the test of Requirement 1.

 

Note: FAA AD T96-23-51 refers.

 

Compliance: 1. For Requirement 1, prior to 14 November 1996 and there after at intervals not to exceed 250 hours time in service.

 

2. For Requirement 2, before further flight.

 

Background: Recent tests on the main rudder PCU conducted by Boeing demonstrated a potential failure scenario that was previously unknown. These tests revealed that rudder pedal can cause deformation in the linkage leading to the primary and secondary slides of the servo valve of the main rudder PCU if the secondary slide of the PCU jams in certain positions. This situation could result in rudder motion in the opposite direction of the rudder command.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Interactions

Authorises

All Versions

Sourced from the Federal Register of Legislation at 26 August 2026. For the latest information on Australian Government law please go to https://www.legislation.gov.au.