AD/B-2/29 Amdt 1 - Tail Rotor Drive Shaft - Inspection and Corrosion Proofing

Administered by Department of Infrastructure, Transport, Regional Development, Communications, Sport and the Arts

Legislation au F2006B02601 In force Legislative Instrument

Legislation content

COMMONWEALTH OF AUSTRALIA (Civil Aviation Regulations 1998), PART 39 - 105 CIVIL AVIATION SAFETY AUTHORITY

SCHEDULE OF AIRWORTHINESS DIRECTIVES

 


Brantly B-2 Series Helicopters

 

AD/B-2/29

Amdt 1


Tail Rotor Drive Shaft - Inspection and Corrosion Proofing


12/68

 

Applicability: All model B2, B2A and B2B. Document:  Brantly SB No. B2B-68-2A.

Compliance: Within 10 hours time in service after 31 December 1968.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Overview

The Civil Aviation Regulations 1998, enacted by the Australian Parliament, play a crucial role in ensuring the safety and efficiency of civil aviation within Australia. One specific aspect of these regulations, detailed in Part 39, focuses on the issuance of airworthiness directives to maintain the safety standards of aircraft. The Legislative Instrument F2006B02601, introduced under the authority of the Civil Aviation Act 1988, addresses the need for ongoing safety oversight and compliance through the establishment of specific airworthiness directives, such as AD/B-2/29, which mandates the inspection and corrosion proofing of tail rotor drive shafts on Brantly B-2 Series Helicopters. This directive was introduced to rectify identified safety issues and ensure that aircraft operations remain within safe operational parameters, ultimately aiming to enhance the overall safety of civil aviation. The Brantly B-2 Series Helicopters directive, as outlined in the Civil Aviation Regulations 1998, specifically targets the inspection and corrosion proofing of tail rotor drive shafts on all model B2, B2A, and B2B helicopters. This directive was necessitated by the identification of potential safety risks associated with these components, which could compromise the integrity and performance of the helicopters. Compliance with this directive is required within 10 hours of time in service after 31 December 1968, as referenced in Brantly SB No. B2B-68-2A. The policy objective of these regulations is to ensure that all aircraft operating within Australia meet stringent safety standards, thereby protecting both the aviation community and the public from potential hazards.

Scope and Application

The Civil Aviation Regulations 1998, specifically under Part 39 - 105, pertains to the Civil Aviation Safety Authority's schedule of airworthiness directives, focusing on the Brantly B-2 Series Helicopters. This regulation applies to all model B2, B2A, and B2B helicopters, demanding compliance with the directive concerning the tail rotor drive shaft inspection and corrosion proofing as detailed in Brantly Service Bulletin No. B2B-68-2A. The directive mandates that these inspections and necessary corrosion proofing must be completed within 10 hours of time in service after 31 December 1968. This regulation is a vital safety measure ensuring that these specific helicopter models maintain their airworthiness and safety standards, thereby affecting all operators and owners of the aforementioned helicopter models within the Commonwealth of Australia. The directive is comprehensive in its application, extending its reach to every individual and entity operating these helicopters, ensuring adherence to the specified safety protocols.

Key Provisions

The Civil Aviation Regulations 1998, specifically Part 39 - 105, details the Civil Aviation Safety Authority's (CASA) schedule of airworthiness directives for various aircraft, including the Brantly B-2 Series Helicopters. Section AD/B-2/29 Amendment 1 addresses the tail rotor drive shaft for models B2, B2A, and B2B. This directive mandates an inspection and corrosion proofing of the tail rotor drive shaft (Section 39 - 105). Compliance with this directive is required within 10 hours of time in service after 31 December 1968, as specified in Brantly Service Bulletin No. B2B-68-2A (Section AD/B-2/29 Amendment 1). The obligations imposed by this airworthiness directive are clear and specific. Operators and owners of Brantly B-2 Series Helicopters must ensure that the inspection and corrosion proofing of the tail rotor drive shaft are carried out within the specified timeframe (Section AD/B-2/29 Amendment 1). This involves conducting a thorough visual and mechanical inspection to identify any signs of corrosion or damage. Following the inspection, appropriate corrosion proofing measures must be applied to prevent further deterioration of the tail rotor drive shaft. Proper documentation of the inspection and any remedial actions taken must be maintained and made available for review by CASA upon request (Section 39 - 105). Failure to comply with the requirements set out in the airworthiness directive can result in serious legal consequences. Under the Civil Aviation Act 1988, non-compliance with airworthiness directives can be considered an offence. The maximum penalty for contravening these regulations includes fines and potential imprisonment. Specifically, individuals and corporations can be fined up to $21,000, and in the case of a body corporate, the fine can be significantly higher, reaching up to $1,050,000 (Section 96 of the Civil Aviation Act 1988). Additionally, CASA may take enforcement actions such as grounding the aircraft until compliance is achieved, which can have severe operational and financial repercussions for the operators.

Legal classification tags

Area of Law
Aviation Law
Instrument
Legislative Instrument
Concepts
Definitions & Interpretation
Compliance Obligations
Prohibited Conduct

Interactions

Authorises

All Versions

Sourced from the Federal Register of Legislation at 26 August 2026. For the latest information on Australian Government law please go to https://www.legislation.gov.au.