Actions Determined as Requiring Approval, Actions Determined as Not Requiring Approval, Assessment Approach, Decision on Approval, Variation of Conditions of Approval, Notice of Extension of Time

Administered by Department of Climate Change, Energy, the Environment and Water

Legislation au C2013G01602 In force Gazette

Legislation content

 

DEPARTMENT OF THE ENVIRONMENT

Environment Protection and Biodiversity Conservation Act 1999

 

For further information see the referrals list at http://www.environment.gov.au/epbc/notices

and type the reference number in the Search box

 

actions determined as requiring approval (EPBC Act s.75)

Reference

Title

Controlling Provisions

Date

2013/6908

Liddell Coal Operations Pty Ltd/Mining/25 kms NW Singleton, Hunter Valley/NSW/Extension of Liddell open cut coal mining operations, NSW

  • Listed threatened species and communities (sections 18 & 18A)
  • Listed migratory species (sections 20 & 20A)
  • A water resource, in relation to coal seam gas development and large coal mining development (sections 24D & 24E)

21/10/2013

2013/6999

Macarthur Developments Pty Ltd/Residential development/Camden Valley Way/NSW/Emerald Hills residential & commercial estate development, Camden Valley Way, Leppington, NSW

  • Listed threatened species and communities (sections 18 & 18A)

21/10/2013

2013/6967

Hy-Tec Industries Pty Limited/Mining/3.5kms SW of Hartley/NSW/Hartley Quarry Stage 2, NSW

  • Listed threatened species and communities (sections 18 & 18A)

23/10/2013

2013/6978

Mr Stephen Hubert/Mining/Mt Owen, Upper Hunter Valley/NSW/Mt Owen continued coal mining operation

  • Listed threatened species and communities (sections 18 & 18A)
  • Listed migratory species (sections 20 & 20A)
  • A water resource, in relation to coal seam gas development and large coal mining development (sections 24D & 24E)

24/10/2013

 

actions determined as NOT requiring approval (EPBC Act s.75)

Reference

Title

Date

2013/7017

Department of Finance and Deregulation/Commonwealth/John Gorton Building, Parkes/ACT/John Gorton Building Safety Fence & Overhead Protection, Parks, ACT

25/10/2013

2013/6952*

Apache Energy Limited/Commercial development/Varanus Island/WA/Consturction & operation of the Varanus Island kitchen & mess cyclone refuge building, compression plant & accomidation camp, Varanus Island

22/10/2013

2013/6988*

Darwin Port Corporation/Transport - water/Outer part of Darwin Harbour/NT/Dredging the outer shipping channels of Darwin Harbour

22/10/2013

* Actions which are not controlled actions provided they are undertaken in a particular manner. Further information on provision and manner specified is available from www.environment.gov.au/epbc/notices

 

Assessment Approach (EPBC Act s.87)

Reference

Title

Assessment Approach

Date

2013/6908

Liddell Coal Operations Pty Ltd/Mining/25 kms NW Singleton, Hunter Valley/NSW/Extension of Liddell open cut coal mining operations, NSW

Preliminary Documentation

21/10/2013

2013/6999

Macarthur Developments Pty Ltd/Residential development/Camden Valley Way/NSW/Emerald Hills residential & commercial estate development, Camden Valley Way, Leppington, NSW

Preliminary Documentation

21/10/2013

2013/6967

Hy-Tec Industries Pty Limited/Mining/3.5kms SW of Hartley/NSW/Hartley Quarry Stage 2, NSW

Accredited Assessment Process at the level of Environmental Impact Statement under Part 4 of the NSW Environmental Planning and Assessment Act 1979

23/10/2013

2013/6978

Mr Stephen Hubert/Mining/Mt Owen, Upper Hunter Valley/NSW/Mt Owen continued coal mining operation

Accredited Assessment Process under the NSW Environmental Planning and Assessment Act 1979

24/10/2013

 

DECISION ON APPROVAL (EPBC Act s.133)

Reference

Title

Approval Decision

Date

2011/5898

Huntlee Pty Ltd/Residential development/Wine Country Drive, North Rothbury/NSW/Residential development

Approved with conditions

15/10/2013

2013/6778

State of Victoria - Department of Justice/Commercial development/101 - 201 Riding Boundary Road, Ravenhall/VIC/Ravenhall Prison Project, Melbourne

Approved with conditions

23/10/2013

variation of conditions of approval (EPBC Act s.143)

Reference

Title

Date

2008/3959

Property Projects NQ Pty Ltd/Residential development/Lot 2 RP732964, West of Tully-Mission Beach Rd, Mission Beach/QLD/Tully-Mission Beach Road 40 Lot Residential Subdivision

16/10/2013

2005/2389

SMB1 Mission Beach Pty Ltd/Tourism, recreation and conservation management/Mission Beach/QLD/Development of a resort complex

23/10/2013

2008/4638

Peet Limited/Residential development/Alkimos, 40 km N-W of Perth/WA/Proposed Urban Development of Lots 1005 & 1006

23/10/2013

2011/5971

City of Rockingham/Transport - land/Between Kwinana Freeway East and Dixon Road West/WA/Extend a section of Mundijong Road

23/10/2013

 

NOTICE OF EXTENSION OF TIME (EPBC Act s.130(4))

Reference

Title

Extended to

Date

2009/5008

Shell Development (Australia) Pty Ltd/Mining/Gladstone City Gate to Curtis Island/QLD/Construction of a high pressure gas pipeline, Gladstone City Gate to Curtis Island, Qld

13/12/2013

21/10/2013

2011/6194

Adani Abbot Point Terminal Pty Ltd /Mining/Port of Abbot Point/QLD/Abbot Point Coal Terminal 0

13/12/2013

21/10/2013

2011/6213

North Queensland Bulk Ports Corporation Limited/Exploration (mineral, oil and gas - marine)/Approx 3km offshore Abbot Point/QLD/Abbot Point Terminal 0, 2 & 3 Capital Dredging

13/12/2013

21/10/2013

2012/6336

Spencer Guf Port Link/Transport - water/Port Bonython, Eyre Peninsula, SA/SA/Port Bonython Bulk Commodities Export Facility, SA

07/02/2013

21/10/2013

2009/5007

Shell Development (Australia) Pty Ltd/Energy generation and supply (non-renewable)/Curtis Island, Approx. 6km N of Gladstone, QLD/QLD/Investigating the Development of a Liquefied Natural Gas Facility

13/12/2013

22/10/2013

 

Some public notifications on the Internet and in the Gazette relating to the processing of referrals for approval under Chapter 4 of the Environment Protection and Biodiversity Conservation Act 1999 may occasionally be missed in processing by the Department of the Environment or may not meet timeframes for notification. The Department of the Environment has implemented systems and ongoing quality assurance procedures to minimise any risk of missing a notification within the required timeframe. Where a missed notification is identified the practice will be to notify these even though the timeframe for notification has lapsed. This will ensure that the history of notifications for each referral is available to the public. The Department of the Environment regrets any inconvenience that may be caused by a missed notification. Please note that late notifications have not affected subsequent processing of referrals or assessments and they do not affect decisions made.

Overview

The Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act) was enacted to provide for the protection of the environment, particularly matters of national environmental significance, and to establish a framework for the assessment of proposals likely to have a significant impact on the environment. The EPBC Act was introduced to address the need for a coordinated national approach to environmental protection, ensuring that federal, state, and territory governments work together to safeguard Australia's unique biodiversity and ecosystems. The Act was enacted by the Australian Parliament with the aim of fostering sustainable development by integrating environmental considerations into decision-making processes. The policy objective of the EPBC Act is to protect and conserve Australia's environment, particularly its biodiversity, ecosystems, and natural heritage, while enabling economic growth and development in a sustainable manner.

Scope and Application

The Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act) applies to a broad range of entities, including individuals, companies, and government bodies, and covers various activities such as mining, residential and commercial developments, and energy projects. The Act's jurisdiction is national, extending across Australia and impacting industries that may affect matters of national environmental significance, such as listed threatened species, communities, and migratory species, as well as water resources in relation to certain developments. The Act delineates specific exclusions and exemptions, such as actions determined not to require approval provided they adhere to particular provisions, which can be found on the EPBC Act website. The scope of the Act may be further extended or restricted through subordinate instruments, which provide detailed regulations and guidelines on specific matters. The Department of the Environment ensures that public notifications regarding approvals and assessments under the Act are diligently processed, with measures in place to address any missed notifications to maintain transparency and public access to information.

Key Provisions

The Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act) includes key provisions that dictate the process for environmental impact assessments and approvals for certain actions that may affect matters of national environmental significance. Under Section 75 of the EPBC Act, actions that are likely to have a significant impact on a matter of national environmental significance require approval. Matters of national environmental significance include listed threatened species and communities, listed migratory species, and water resources in relation to coal seam gas development and large coal mining operations (sections 18, 18A, 20, 20A, 24D, and 24E). Various projects have been referred for approval under these sections, such as the extension of Liddell open cut coal mining operations in New South Wales and the Emerald Hills residential and commercial estate development in Camden Valley Way, Leppington, NSW. The EPBC Act imposes several obligations on entities proposing actions that may affect matters of national environmental significance. These obligations include providing preliminary documentation and, in some cases, undergoing an accredited assessment process as specified in state or territory laws. For instance, the Hartley Quarry Stage 2 project in New South Wales is required to follow the accredited assessment process at the level of Environmental Impact Statement under Part 4 of the NSW Environmental Planning and Assessment Act 1979. Additionally, the Act allows for the variation of conditions of approval to ensure ongoing compliance with environmental standards. Failure to comply with the provisions of the EPBC Act can result in both civil and criminal consequences. The Act stipulates various offences and penalties for non-compliance, although the exact penalties are not specified in the text provided. It is crucial for entities to adhere to the stipulated requirements to avoid legal repercussions. For example, the Huntlee Pty Ltd residential development in North Rothbury, NSW, was approved with conditions, indicating the need for compliance with specific terms to mitigate environmental impacts. In some instances, the Department of the Environment may extend the time for providing public notifications about the processing of referrals for approval. Although the Department has implemented quality assurance procedures to minimize the risk of missed notifications, any identified late notifications are still communicated to the public to maintain transparency. However, it is noted that these late notifications do not affect the subsequent processing of referrals or the decisions made, ensuring the integrity of the assessment process.

Legal classification tags

Area of Law
Environmental Law
Instrument
Gazette Notice
Concepts
Reporting & Disclosure Obligations
Enforcement Powers
Licensing & Registration

Interactions

Authorises

All Versions

Sourced from the Federal Register of Legislation at 26 August 2026. For the latest information on Australian Government law please go to https://www.legislation.gov.au.