Actions Determined as Requiring Approval, Actions Determined as Not Requiring Approval, Assessment Approach, Decision on Approval, Variation of Conditions of Approval and Notice of Extension of Time

Administered by Department of Agriculture, Fisheries and Forestry

Legislation au C2020G00839 In force Gazette

Legislation content

 

DEPARTMENT OF AGRICULTURE, WATER AND THE ENVIRONMENT

Environment Protection and Biodiversity Conservation Act 1999

 

For further information see the referrals list at http://epbcnotices.environment.gov.au/referralslist/

and type the reference number in the Filter by Referral Number box

 

actions determined as requiring approval (EPBC Act s.75)

Reference

Title

Controlling Provisions

Date

2020/8755

CleanCo Queensland Limited / Energy Generation and Supply (renewable) / located approximately 40 km south-west of the township of Warwick / Queensland / Karara Wind Farm Project, QLD

  • Listed threatened species and communities (sections 18 & 18A)
  • Listed migratory species (sections 20 & 20A)

25/09/2020

2020/8744

Lower Murray Urban and Rural Water Corporation / Water Management and Use / The project is located on the Belsar-Yungera floodplain complex, near Robinvale / Victoria / Belsar-Yungera Floodplain Restoration Project, VIC

  • Listed threatened species and communities (sections 18 & 18A)

29/09/2020

2020/8768

Transport Canberra and City Services / Transport - Land / Monaro Highway in the ACT between Sheppard St intersection and David Warren Rd intersection / Australian Capital Territory / Monaro Highway - Lanyon Drive Upgrade Package 1C

  • Listed threatened species and communities (sections 18 & 18A)

29/09/2020

2020/8766

NSW Electricity Networks Operations Pty Ltd / Energy Generation and Supply (non-renewable) / Between Buronga and Wagga Wagga / New South Wales / EnergyConnect NSW - Eastern Section

  • Listed threatened species and communities (sections 18 & 18A)

30/09/2020

 

actions determined as NOT requiring approval (EPBC Act s.75)

Reference

Title

Date

2020/8767

Transport Canberra and City Services / Transport - Land / Monaro Highway in the ACT between Sheppard St intersection and David Warren Rd intersection / Australian Capital Territory / Monaro Highway - Lanyon Drive Upgrade Package 1B, Hume, ACT

30/09/2020

 

Assessment Approach (EPBC Act s.87)

Reference

Title

Assessment Approach

Date

2020/8755

CleanCo Queensland Limited / Energy Generation and Supply (renewable) / located approximately 40 km south-west of the township of Warwick / Queensland / Karara Wind Farm Project, QLD

Preliminary Documentation

25/09/2020

2020/8768

Transport Canberra and City Services / Transport - Land / Monaro Highway in the ACT between Sheppard St intersection and David Warren Rd intersection / Australian Capital Territory / Monaro Highway - Lanyon Drive Upgrade Package 1C

Preliminary Documentation

29/09/2020

 

DECISION ON APPROVAL (EPBC Act s.133)

Reference

Title

Approval Decision

Date

2017/7932

WATER CORPORATION / Transport - Water / see attached / Western Australia / Vasse Diversion Drain Upgrade

Approved with conditions

24/09/2020

2016/7724

Celestino Pty Limited / Residential Development / 40kms SW Brisbane and 17kms Nthe of Beaudesert / Queensland / Residential development, Teviot Road, north Beaudesert, Qld

Approved with conditions

28/09/2020

2019/8469

NT MINING OPERATIONS PTY LTD / Mining / Mary River West Station (Pastoral Lease 815) – NT Portion 1630, Volume 816, Folio 598 / Northern Territory / Union Reefs North Underground Gold Mine, near Pine Creek, NT

Approved with conditions

28/09/2020

2016/7727

Reward Minerals Ltd / Mining / Lake Disappointment approx 320km east of Newman / Western Australia / Lake Disappointment Potash Project, WA

Approved with conditions

30/09/2020

2016/7729

Australian Rail Track Corporation Ltd / Transport - Land / Narrabri to North Star / New South Wales / Narrabri to North Star Section of Inland Rail, NSW

Approved with conditions

1/10/2020

variation of conditions of approval (EPBC Act s.143)

Reference

Title

Date

2012/6538

Far North Queensland Ports Corporation Limited (t / a Ports North) / Transport - Land / Trinity Inlet, Cairns / Queensland / Cairns Shipping Development (Trinity Inlet) Project, QLD

22/09/2020

2010/5500

OAKAJEE PORT AND RAIL / Transport - Land / Oakajee Port to Jack Hills, with spur line to Weld Range / Western Australia / Oakajee Rail Development

24/09/2020

2011/5797

OAKAJEE PORT AND RAIL / Transport - Land / 25km north of Geraldton / Western Australia / Construction of the Oakajee Port and Rail Project

25/09/2020

 

NOTICE OF EXTENSION OF TIME (EPBC Act s.130(4))

Reference

Title

Extended to

Date

2016/7649

Vickery Coal Pty Ltd / Mining / approx. 25km north of Gunnedah and 10km east of Boggabri / New South Wales / Vickery Coal Mine Extension Project, Gunnedah, NSW

10/12/2020

29/09/2020

 

Some public notifications on the Internet and in the Gazette relating to the processing of referrals for approval under Chapter 4 of the Environment Protection and Biodiversity Conservation Act 1999 may occasionally be missed in processing by the Department of Agriculture, Water and the Environment or may not meet timeframes for notification. The Department of Agriculture, Water and the Environment has implemented systems and ongoing quality assurance procedures to minimise any risk of missing a notification within the required timeframe. Where a missed notification is identified the practice will be to notify these even though the timeframe for notification has lapsed. This will ensure that the history of notifications for each referral is available to the public. The Department of Agriculture, Water and the Environment regrets any inconvenience that may be caused by a missed notification. Please note that late notifications have not affected subsequent processing of referrals or assessments and they do not affect decisions made.

Overview

The Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act) was enacted to provide for the protection of the environment, particularly matters of national environmental significance, through the regulation of actions that may have a significant impact on the environment. The Act was introduced to address the gap in environmental protection that existed at the federal level, particularly in relation to the conservation of biodiversity and the management of environmental impacts of developments. The EPBC Act is administered by the Commonwealth Parliament and aims to achieve a balanced and nationally consistent approach to environmental protection. The Department of Agriculture, Water and the Environment is responsible for the administration of the EPBC Act, and ensures compliance with the Act through the regulation of actions that may have a significant impact on the environment. The department also implements quality assurance procedures to minimise the risk of missed notifications and ensures that any missed notifications are communicated to the public, even if the timeframe for notification has lapsed. The policy objective of the EPBC Act is to protect and conserve Australia's biodiversity and environment, while also promoting sustainable development and economic growth.

Scope and Application

The Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act) applies to any actions that are declared to be 'controlled actions' under the Act, and which may have a significant impact on matters of national environmental significance. These matters include World Heritage properties, listed threatened species and ecological communities, listed migratory species, the marine environment, the Great Barrier Reef Marine Park, the waters of the Commonwealth, and the Antarctic. The Act applies to both individuals and entities, including corporations, government departments, and local councils, across all states and territories in Australia, as well as external territories. However, the Act does not apply to actions that are specifically excluded under the Act, such as certain activities related to national security, defence, or certain activities on Aboriginal land. The Act may also be extended or restricted through subordinate instruments such as regulations or guidelines. The Act provides for a range of assessment and approval processes, including referral to the Minister for the Environment, public notifications, and the preparation of assessment reports.

Key Provisions

The Environment Protection and Biodiversity Conservation Act 1999 (the "EPBC Act") governs the protection of the environment, particularly concerning actions that may impact listed threatened species and communities, listed migratory species, and other environmental elements of national or international significance. Section 75 of the EPBC Act requires that certain actions are assessed for their potential environmental impacts, and in some cases, these actions may require formal approval (sections 132 and 133). Conversely, section 75 also allows the Minister to determine that certain actions do not require approval if they are unlikely to have a significant impact on protected matters (section 75). For instance, in 2020, it was determined that the "Monaro Highway - Lanyon Drive Upgrade Package 1B, Hume, ACT" by Transport Canberra and City Services did not require approval (EPBC Act s.75). Under the EPBC Act, parties or entities involved in actions that require approval must adhere to stringent assessment and compliance protocols. These include submitting detailed environmental impact assessments and management plans, engaging in public consultations, and complying with any conditions set forth in the approval decision (sections 132, 133, and 143). For example, the "Karara Wind Farm Project, QLD" by CleanCo Queensland Limited was approved with specific conditions that must be followed to mitigate its environmental impact. Failure to comply with the requirements of the EPBC Act can result in significant legal consequences. Breaches of the Act may lead to enforcement actions by the Department of Agriculture, Water and the Environment, including fines, penalties, or even criminal charges (sections 535 and 536). The maximum penalties can vary significantly depending on the nature and severity of the breach. For example, individuals found guilty of contravening the EPBC Act can face fines of up to AUD 66,000 or imprisonment for up to two years, while corporations can face fines of up to AUD 330,000. Furthermore, ongoing non-compliance or repeated offences can lead to more severe penalties and long-term reputational damage. The EPBC Act thus imposes a substantial obligation on entities to ensure full compliance with its provisions to avoid these serious repercussions.

Legal classification tags

Area of Law
Environmental Law
Instrument
Gazette Notice
Concepts
Definitions & Interpretation
Enforcement Powers
Reporting & Disclosure Obligations
Regulatory Standards

Interactions

Authorises

All Versions

Sourced from the Federal Register of Legislation at 26 August 2026. For the latest information on Australian Government law please go to https://www.legislation.gov.au.