Actions Determined as Requiring Approval, Actions Determined as Not Requiring Approval, Assessment Approach, Decision on Approval, Variation of Conditions of Approval and Notice of Extension of Time

Administered by Department of Agriculture, Fisheries and Forestry

Legislation au C2020G00610 In force Gazette

Legislation content

 

DEPARTMENT OF AGRICULTURE, WATER AND THE ENVIRONMENT

Environment Protection and Biodiversity Conservation Act 1999

 

For further information see the referrals list at http://epbcnotices.environment.gov.au/referralslist/

and type the reference number in the Filter by Referral Number box

 

actions determined as requiring approval (EPBC Act s.75)

Reference

Title

Controlling Provisions

Date

2019/8586

WIM Resource Pty Ltd / Mining / near Dooen / Victoria / Avonbank Heavy Mineral Sands Project

  • Listed threatened species and communities (sections 18 & 18A)
  • Nuclear actions (sections 21 & 22A)

3/07/2020

2020/8661

Cooperative Bulk Handling Group / Agriculture and Forestry / Wheatbin Road, Moora / Western Australia / Moora Grain Receival Site, Moora

  • Listed threatened species and communities (sections 18 & 18A)

 

3/07/2020

2020/8662

Port Arthur Historic Site Management Authority / Tourism and Recreation / 16 Degraves and 23 Syme St, South Hobart / Tasmania / Cascades Female Factory History and Interpretation Centre

  • World Heritage (sections 12 & 15A)
  • National Heritage (sections 15B & 15C)

7/07/2020

2020/8658

Beach Energy (Perth Basin) Pty Ltd / Exploration (mineral, oil and gas - non-marine) / between Eneabba and Dongara, Shires of Irwin, Carnamah, Three Springs and Mingenew / Western Australia / Zemira 3D Seismic Survey

  • Listed threatened species and communities (sections 18 & 18A)

 

8/07/2020

 

actions determined as NOT requiring approval (EPBC Act s.75)

Reference

Title

Date

2020/8672

APT Pipelines (NT) Pty Limited / Energy Generation and Supply (non-renewable) / Near Darwin / Northern Territory / Channel Island Bridge Pipeline Replacement Project

2/07/2020

 

Assessment Approach (EPBC Act s.87)

Reference

Title

Assessment Approach

Date

2020/8661

Cooperative Bulk Handling Group / Agriculture and Forestry / Wheatbin Road, Moora / Western Australia / Moora Grain Receival Site, Moora

Preliminary Documentation

3/07/2020

2020/8662

Port Arthur Historic Site Management Authority / Tourism and Recreation / 16 Degraves and 23 Syme St, South Hobart / Tasmania / Cascades Female Factory History and Interpretation Centre

Preliminary Documentation

7/07/2020

2020/8658

Beach Energy (Perth Basin) Pty Ltd / Exploration (mineral, oil and gas - non-marine) / between Eneabba and Dongara, Shires of Irwin, Carnamah, Three Springs and Mingenew / Western Australia / Zemira 3D Seismic Survey

Accredited Assessment Process under the Environmental Protection Act 1986 (WA)

8/07/2020

 

DECISION ON APPROVAL (EPBC Act s.133)

Reference

Title

Approval Decision

Date

2018/8258

WOLLAR SOLAR DEVELOPMENT PTY LTD / Energy Generation and Supply (renewable) / Multiple lots, approximately 7km from Wollar, NSW / New South Wales / Wollar Solar Farm, near Wollar, NSW

Approved with conditions

6/07/2020

2017/8017

ROBE RIVER MINING CO PTY LTD / Mining / 16 km SW Pannawonica / Western Australia / Development of the Mesa H iron ore mining operations, WA

Approved with conditions

7/07/2020

 

variation of conditions of approval (EPBC Act s.143)

Reference

Title

Date

2011/6201

SHENHUA WATERMARK COAL PTY LIMITED / Mining / 35km South East of Gunnedah / New South Wales / Watermark Coal Project

3/07/2020

 

NOTICE OF EXTENSION OF TIME (EPBC Act s.130(4))

Reference

Title

Extended to

Date

2017/8022

AUSBUILD DEVELOPMENT CORP PTY LTD / Residential Development / Multiple properties - refer Lot and RP descriptions on Figure 2.  / Queensland / Warner Road Residential Development, Warner, Qld

27/07/2020

9/07/2020

 

Some public notifications on the Internet and in the Gazette relating to the processing of referrals for approval under Chapter 4 of the Environment Protection and Biodiversity Conservation Act 1999 may occasionally be missed in processing by the Department of Agriculture, Water and the Environment or may not meet timeframes for notification. The Department of Agriculture, Water and the Environment has implemented systems and ongoing quality assurance procedures to minimise any risk of missing a notification within the required timeframe. Where a missed notification is identified the practice will be to notify these even though the timeframe for notification has lapsed. This will ensure that the history of notifications for each referral is available to the public. The Department of Agriculture, Water and the Environment regrets any inconvenience that may be caused by a missed notification. Please note that late notifications have not affected subsequent processing of referrals or assessments and they do not affect decisions made.

Overview

The Environment Protection and Biodiversity Conservation Act 1999 was enacted to provide for the protection of the environment, particularly matters of national environmental significance, under a cooperative Commonwealth and State framework. The Act was introduced to address gaps in environmental protection by establishing a comprehensive framework for the conservation of biodiversity and the protection of the environment, including the regulation of activities that may impact on listed threatened species, ecological communities, World Heritage properties, and other areas of national environmental significance. The Act is administered by the Department of Agriculture, Water and the Environment, which ensures that the policy objectives of the Act are met through the regulation of activities that may impact on the environment. Although the Act aims to provide a robust framework for environmental protection, the Department acknowledges that there may be instances where notifications are missed or delayed, and has implemented quality assurance procedures to minimise such occurrences and ensure public access to information on referrals.

Scope and Application

The Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act) applies to a wide range of activities and entities across Australia, including individuals, corporations, and government bodies, that may have significant impacts on matters of national environmental significance. These matters include World Heritage properties, listed threatened species and ecological communities, and Ramsar listed wetlands. The Act has a broad jurisdictional reach, applying to actions taken within Australia and by Australian citizens abroad, thereby extending its influence both nationally and internationally. The EPBC Act also provides for the creation of subordinate legislation that can extend or restrict the application of the Act, allowing for more specific or targeted regulatory measures. Exclusions and exemptions from the Act can be found in the various sections of the legislation, and certain thresholds determine whether an action requires approval under the Act. The Act provides mechanisms for both the approval and disapproval of actions that may significantly impact the environment, with decisions published in the Gazette to ensure transparency and public access to information regarding environmental decisions.

Key Provisions

The Environment Protection and Biodiversity Conservation Act 1999 (the EPBC Act) governs various activities that may impact the environment, requiring certain actions to obtain approval from the Minister for the Environment. Under the Act, specific actions are identified as needing approval (sections 75). For example, the Avonbank Heavy Mineral Sands Project by WIM Resource Pty Ltd in Victoria, the Moora Grain Receival Site by Cooperative Bulk Handling Group in Western Australia, and the Cascades Female Factory History and Interpretation Centre by the Port Arthur Historic Site Management Authority in Tasmania are all subject to this requirement due to their potential impacts on listed threatened species and communities (sections 18 and 18A) or World and National Heritage places (sections 12, 15A, 15B, and 15C). The Act imposes several obligations on entities seeking approval for actions that may affect the environment. These entities must provide preliminary documentation or undergo an accredited assessment process, as stipulated by the Act and other relevant legislation, such as the Environmental Protection Act 1986 (WA). For instance, the Moora Grain Receival Site and the Cascades Female Factory History and Interpretation Centre followed the preliminary documentation approach, while the Zemira 3D Seismic Survey by Beach Energy (Perth Basin) Pty Ltd adhered to the accredited assessment process under the Environmental Protection Act 1986 (WA). Failure to comply with the requirements of the EPBC Act may result in civil or criminal penalties. The Act does not specify the exact penalties but indicates that non-compliance can lead to legal consequences. For example, the Channel Island Bridge Pipeline Replacement Project by APT Pipelines (NT) Pty Limited was determined not to require approval, and the Department of Agriculture, Water and the Environment has systems in place to minimise missed notifications, ensuring transparency and accountability. In cases where an action is approved with conditions, the Minister may also impose conditions to mitigate any potential environmental harm. For example, the Wollar Solar Farm, near Wollar, NSW, and the Mesa H iron ore mining operations in Western Australia were both approved with conditions to manage their environmental impacts. Additionally, the conditions of existing approvals may be varied to address new information or changed circumstances, as seen in the case of the Watermark Coal Project by Shenhua Watermark Coal Pty Limited.

Legal classification tags

Area of Law
Environmental Law
Instrument
Gazette Notice
Concepts
Reporting & Disclosure Obligations
Regulatory Standards
Offence Provisions

Interactions

Authorises

All Versions

Sourced from the Federal Register of Legislation at 26 August 2026. For the latest information on Australian Government law please go to https://www.legislation.gov.au.