Actions Determined as Requiring Approval, Actions Determined as Not Requiring Approval, Assessment Approach, Decision on Approval, Outcome of Request for Reconsideration of s75(1) Decision, Variation of Conditions of Approval and Notice of Extension of Time

Administered by Department of Agriculture, Fisheries and Forestry

Legislation au C2016G01261 In force Gazette

Legislation content

 

DEPARTMENT OF THE ENVIRONMENT AND ENERGY

Environment Protection and Biodiversity Conservation Act 1999

 

For further information see the referrals list at http://epbcnotices.environment.gov.au/referralslist/

and type the reference number in the Filter by Referral Number box

 

actions determined as requiring approval (EPBC Act s.75)

Reference

Title

Controlling Provisions

Date

2016/7756

FQM Australia Nickel Pty Ltd/Mining/Lot 1269 South Coast Hway/Western Australia/Expansion of Ravensthorpe Nickel Operations and changes to associated infrastructure, Ravensthorpe, WA

  • Listed threatened species and communities (sections 18 & 18A)

2/09/2016

2016/7746

Stockyard Hill Wind Farm Pty Ltd/Energy Generation and Supply (renewable)/Approx. 150km west, north-west Melbourne and approx. 35km west of Ballarat/Victoria/Stockyard Hill Wind Farm - Wind Energy Facility and associated infrastucture, Vic

  • Listed threatened species and communities (sections 18 & 18A)

14/09/2016

 

actions determined as NOT requiring approval (EPBC Act s.75)

Reference

Title

Date

2016/7742

ACT Procurement/Transport - Land/Mustang Avenue roundabout, Majura Road, Pialligo, ACT/Australian Capital Territory/Construction of the IKEA Canberra Northern Access Road, ACT

25/08/2016

2016/7747

Bellmere Land Holdings 1 Pty Ltd/Residential Development/Approx 4km west of Caboolture, 44km north west of Brisbane City/Queensland/Residential development, Stern Road, Bellmere, QLD

8/09/2016

2016/7713

Project Sea Dragon Pty Ltd/Aquaculture/Point Ceylon, approx. 105km from Darwin/Northern Territory/Core Breeding and Broodstock Maturation Centre development, Point Ceylon, NT

13/09/2016

2016/7763

Salt Creek Wind Farm Pty Ltd/Energy Generation and Supply (non-renewable)/South of Woorndoo and Terang via Mortlake, west Victoria/Victoria/Salt Creek Wind Farm transmission line, Vic

13/09/2016

2016/7754*

KEPCO BYLONG AUSTRALIA PTY LTD/Energy Generation and Supply (non-renewable)/Within the Mid-Western Regional Council LGA/New South Wales/Ilford to Bylong Transmission Line Upgrade, NSW

12/09/2016

* Actions which are not controlled actions provided they are undertaken in a particular manner. Further information on provision and manner specified is available from http://epbcnotices.environment.gov.au/referralslist/

 

Assessment Approach (EPBC Act s.87)

Reference

Title

Assessment Approach

Date

2016/7746

Stockyard Hill Wind Farm Pty Ltd/Energy Generation and Supply (renewable)/Approx. 150km west, north-west Melbourne and approx. 35km west of Ballarat/Victoria/Stockyard Hill Wind Farm - Wind Energy Facility and associated infrastucture, Vic

Preliminary Documentation

14/09/2016

 

DECISION ON APPROVAL (EPBC Act s.133)

Reference

Title

Approval Decision

Date

2015/7464

DEPT OF TRANSPORT AND MAIN ROADS/Transport - Land/Queensland Sunshine Coast/Queensland/Bruce Highway upgrade Caloundra to Sunshine Motorway Project no: 280/10A/1

Approved with conditions

2/09/2016

2015/7528

Yarra Valley Water/Waste management (sewerage)/3m west of Epping/VIC/Epping Branch sewer Stage 4B, Victoria

Approved with conditions

8/09/2016

2014/7306

CHERISH ENTERPRISES PTY LTD/Residential Development/Ipswich City/Queensland/Springview Village One, Springfield, Ipswich City, QLD

Approved with conditions

14/09/2016

 

OUTCOME OF REQUEST FOR RECONSIDERATION OF S75(1) DECISION (EPBC Act s.78C)

Reference

Title

Reconsideration Decision

Date

2015/7558

DEPARTMENT OF TRANSPORT AND MAIN ROADS/Transport - Land/Bruce hway, 40kms south of Maryborough/Queensland/Bruce Hway overtaking lane adjustment near Bauple-Woolooga Rd intersection, Qld

Not a Controlled Action

14/09/2016

 

 

variation of conditions of approval (EPBC Act s.143)

Reference

Title

Date

2013/6881

SPRINGVALE COAL PTY LTD/Mining/Newnes State Forest approx 8kms NNE of Lithgow/New South Wales/Springvale Longwall Mine Extension Project, NSW

29/07/2016

2005/2205

FORTESCUE METALS GROUP LIMITED/Mining/Pilbara/Western Australia/Cloud Break Open Pit Iron Ore Mine

11/08/2016

2011/5902

Lend Lease/Residential Development/80L Romeo Rd and 2611 Marmion Ave, Alkimos WA/Western Australia/Residential development Lot 1004 Alkimos WA

19/08/2016

2007/3441

Iluka Resources Limited/Mining/Busselton/Western Australia/Tutunup South Mineral Sands Project

14/09/2016

 

NOTICE OF EXTENSION OF TIME (EPBC Act s.130(4))

Reference

Title

Extended by (Days)

Date

2010/5622

Hanson Construction Materials Pty Ltd/Mining/Shire of Serpentine - Jarrahdale/Western Australia/Extraction of sand from Lot 6 Banksia Road & lots 300 & 301 Boomerang Road, Old

40 business days

1/09/2016

2009/4906

CAMECO AUSTRALIA PTY LTD/Mining/Shire of Wiluna/Western Australia/Yeelirrie Uranium Mine

40 business days

2/09/2016

2007/3423

New Acland Coal Pty Ltd/Mining/Darling Downs/QLD/Stage 3 expansion of New Acland Coal Mine

19  business days

15/09/2016

 

Some public notifications on the Internet and in the Gazette relating to the processing of referrals for approval under Chapter 4 of the Environment Protection and Biodiversity Conservation Act 1999 may occasionally be missed in processing by the Department of the Environment and Energy or may not meet timeframes for notification. The Department of the Environment and Energy has implemented systems and ongoing quality assurance procedures to minimise any risk of missing a notification within the required timeframe. Where a missed notification is identified the practice will be to notify these even though the timeframe for notification has lapsed. This will ensure that the history of notifications for each referral is available to the public. The Department of the Environment and Energy regrets any inconvenience that may be caused by a missed notification. Please note that late notifications have not affected subsequent processing of referrals or assessments and they do not affect decisions made.

 

Overview

The Environment Protection and Biodiversity Conservation Act 1999 was enacted to provide for the protection of the environment, particularly matters of national environmental significance, by establishing a framework for the assessment and approval of actions that may have a significant impact on the environment. This Act was introduced to address the need for a comprehensive approach to environmental protection and biodiversity conservation, ensuring that proposed developments and activities are evaluated for their potential environmental effects. The enacting body was the Commonwealth Parliament, with the primary policy objective being to safeguard Australia's environment and biodiversity through stringent controls and assessments on proposed actions. The Act outlines various mechanisms for the approval, assessment, and monitoring of actions that could affect the environment, including the need for public notifications and consultations. The Department of the Environment and Energy is responsible for administering the Act and ensuring that all actions are assessed in accordance with its provisions. Despite the implementation of quality assurance procedures, there may occasionally be instances where public notifications are missed or not met within the required timeframes. The Department has committed to notifying the public of any such missed notifications, even if they occur beyond the stipulated timeframe, to maintain transparency and ensure the public's right to be informed about environmental matters.

Scope and Application

The Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act) applies to a broad range of actions across Australia, including those by individuals, corporations, and government entities, that may impact matters of national environmental significance. These actions include activities that may affect listed threatened species and ecological communities, World Heritage properties, wetlands of international significance, nuclear actions, and other environmental matters designated under the Act. The Act's jurisdictional reach is national, governing activities that occur within Australia's territorial limits, and it extends to certain activities outside Australia if they impact protected matters within the country. Specific exclusions and exemptions may apply, such as actions that are not controlled actions under certain conditions, as well as projects that have been assessed and approved under the Act or other relevant legislation. The application of the Act can also be extended or restricted through subordinate instruments, which provide detailed regulations and guidelines on specific environmental matters or industries. The Act ensures that significant environmental impacts are assessed and managed through a referral and approval process, overseen by the Department of the Environment and Energy.

Key Provisions

The Environment Protection and Biodiversity Conservation Act 1999 (the "EPBC Act") is a pivotal piece of Australian legislation that provides a framework for the protection of the environment, particularly through the identification and management of actions that may have significant impacts on matters of national environmental significance. Section 75 of the Act specifies that certain actions require formal approval, while other actions are determined not to require approval under Section 75. For example, the proposed expansion of the Ravensthorpe Nickel Operations by FQM Australia Nickel Pty Ltd (reference 2016/7756) is identified as requiring approval (Section 75), while the construction of the IKEA Canberra Northern Access Road by ACT Procurement (reference 2016/7742) is determined not to require approval (Section 75) provided it is undertaken in a specified manner. The Act imposes specific obligations on the parties or entities it governs. For actions that require approval, proponents must submit detailed proposals that include environmental impact assessments and management plans to the Department of the Environment and Energy. For instance, Stockyard Hill Wind Farm Pty Ltd (reference 2016/7746) must provide preliminary documentation as part of the assessment approach outlined in Section 87 of the Act. Additionally, the Act requires that any approved actions must adhere to the conditions set forth in the approval decision. For example, the Bruce Highway upgrade Caloundra to Sunshine Motorway Project by the Department of Transport and Main Roads (reference 2015/7464) was approved with conditions. Failure to comply with the requirements of the EPBC Act can result in various consequences, including both civil and criminal penalties. Under Section 528, individuals or entities found in breach of the Act may be subject to fines. The maximum penalty for individuals is AUD 66,600 or imprisonment for up to two years, or both. For corporations, the maximum penalty can be significantly higher, up to AUD 3.3 million. Additionally, under Section 528A, the court may order the forfeiture of any benefits gained from the contravention. The Act also provides for the possibility of injunctions or other equitable remedies to prevent or remedy non-compliance. For example, the decision on approval for the Epping Branch sewer Stage 4B by Yarra Valley Water (reference 2015/7528) includes specific conditions that, if breached, could lead to enforcement actions under the Act.

Legal classification tags

Area of Law
Environmental Law
Instrument
Gazette Notice
Concepts
Reporting & Disclosure Obligations
Licensing & Registration
Offence Provisions

Interactions

Authorises

All Versions

Sourced from the Federal Register of Legislation at 26 August 2026. For the latest information on Australian Government law please go to https://www.legislation.gov.au.