Actions Determined as Not Requiring Approval, Decision on Approval, Notice of Extension of Time

Administered by Department of Climate Change, Energy, the Environment and Water

Legislation au C2014G00287 In force Gazette

Legislation content

 

DEPARTMENT OF THE ENVIRONMENT

Environment Protection and Biodiversity Conservation Act 1999

 

For further information see the referrals list at http://www.environment.gov.au/epbc/notices

and type the reference number in the Search box

 

actions determined as NOT requiring approval (EPBC Act s.75)

Reference

Title

Date

2014/7115

City of Gosnells/Transport - land/Maddington, WA/WA/Burslem Drive Bridge Duplication Over Canning River, Maddington, WA

10/02/2014

2013/7080*

Apache Energy Limited/Exploration (mineral, oil and gas - marine)/Canarvon Basin/WA/Stag 4D & Reindeer MAZ Marine Seismic Surveys, WA

11/02/2014

2013/7007*

Sunshine Coast Regional Council/Natural resources management/Lot 17 on CG4755 Aragorn St, Maroochydore/QLD/Tepequar Drive Flying Fox Roost Dispersal Management, Maroochydore, Qld

12/02/2014

* Actions which are not controlled actions provided they are undertaken in a particular manner. Further information on provision and manner specified is available from www.environment.gov.au/epbc/notices

 

DECISION ON APPROVAL (EPBC Act s.133)

Reference

Title

Approval Decision

Date

2011/5865

Infigen Suntech Australia Pty Ltd/Energy generation and supply (renewable)/Tarago Road, 6km NE of Bungendore, Southern Tablelands/NSW/Capital Solar Farm Southern Tablelands NSW

Approved with conditions

10/02/2014

2011/5850

Willogoleche Power Pty Ltd/Energy generation and supply (renewable)/3.5 Km from the town of Hallett, SA/SA/Willogoleche Wind Farm, SA

Approved with conditions

28/01/2014

 

NOTICE OF EXTENSION OF TIME (EPBC Act s.130(4))

Reference

Title

Extended to

Date

2012/6336

Spencer Gulf Port Link/Transport - water/Port Bonython, Eyre Peninsula, SA/SA/Port Bonython Bulk Commodities Export Facility, SA

30/06/2014

07/02/2014

 

Some public notifications on the Internet and in the Gazette relating to the processing of referrals for approval under Chapter 4 of the Environment Protection and Biodiversity Conservation Act 1999 may occasionally be missed in processing by the Department of the Environment or may not meet timeframes for notification. The Department of the Environment has implemented systems and ongoing quality assurance procedures to minimise any risk of missing a notification within the required timeframe. Where a missed notification is identified the practice will be to notify these even though the timeframe for notification has lapsed. This will ensure that the history of notifications for each referral is available to the public. The Department of the Environment regrets any inconvenience that may be caused by a missed notification. Please note that late notifications have not affected subsequent processing of referrals or assessments and they do not affect decisions made.

Overview

The Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act) was enacted to provide for the protection of the environment, particularly with respect to matters of national environmental significance. The Act was introduced to address the need for a comprehensive framework for environmental protection that could effectively manage the impacts of human activities on the environment. The EPBC Act is administered by the Australian Government's Department of the Environment, and its primary policy objective is to promote the conservation of Australia's biodiversity and manage the environmental impacts of proposed actions. The Act provides a mechanism for the assessment and approval of actions that may significantly impact the environment, including those actions that are listed as controlled actions. The legislation aims to ensure that environmental considerations are integrated into decision-making processes and that the long-term sustainability of the environment is safeguarded.

Scope and Application

The Environment Protection and Biodiversity Conservation Act 1999 applies to a broad range of actions, entities, and industries, including both public and private sector activities that may impact on matters of national environmental significance, as defined by the Act. The scope of the Act extends to activities that occur within Australian territory, including Commonwealth, state, and territory jurisdictions, and it also applies to activities outside Australia that are undertaken by Australian citizens or corporations. The Act sets out various exclusions and exemptions, such as activities that are already regulated under other Commonwealth, state, or territory legislation, and certain low-impact activities that are listed as not requiring approval. The Act may also extend or restrict its application through subordinate instruments, which provide further detail on the specific actions and circumstances to which the Act applies. The Act provides for the approval, assessment, and monitoring of activities that may impact on matters of national environmental significance, including listed threatened species and ecological communities, heritage places, water resources, and the marine environment.

Key Provisions

The Environment Protection and Biodiversity Conservation Act 1999 (EPBC Act) includes several key provisions governing the management of actions that may impact the environment, particularly those that are considered to be "controlled actions". Section 75 of the EPBC Act identifies actions that are determined as not requiring approval if they are undertaken in a specific manner, ensuring that certain activities do not unnecessarily impede progress while still protecting environmental interests. For instance, actions related to land duplication over a river, like the Burslem Drive Bridge Duplication Over Canning River in Maddington, WA (reference 2014/7115), are included in this category provided they comply with the specified conditions. The Act imposes obligations on parties and entities to ensure that any controlled actions are managed in a way that minimises environmental harm. This includes obligations for conducting environmental impact assessments, preparing management plans, and ensuring that any proposed activities comply with the relevant provisions of the Act. For example, activities such as the marine seismic surveys by Apache Energy Limited in the Carnarvon Basin, WA (reference 2013/7080) must be carried out in accordance with the stipulated environmental management practices. Failure to comply with the requirements of the EPBC Act can lead to significant consequences. The Act provides for both civil and criminal penalties for breaches, which can include fines and imprisonment. For instance, section 133 of the Act outlines the approval process for controlled actions, and non-compliance with the conditions of approval can result in enforcement actions. The maximum penalties for breaches of the Act vary depending on the nature and severity of the offence, with potential fines reaching up to $1.1 million for corporations and $220,000 for individuals, along with possible imprisonment terms. In summary, the EPBC Act sets out a comprehensive framework for managing environmental impacts through the regulation of controlled actions. It mandates that such actions are assessed and managed appropriately to protect the environment, while also providing for consequences for non-compliance that serve as deterrents against improper conduct. The Act ensures that the public is kept informed of the processes and decisions through notifications, even if there are occasional delays, thereby maintaining transparency and accountability in environmental management.

Legal classification tags

Area of Law
Environmental Law
Instrument
Gazette Notice
Concepts
Definitions & Interpretation
Regulatory Standards
Reporting & Disclosure Obligations
Enforcement Powers

Interactions

Authorises

All Versions

Sourced from the Federal Register of Legislation at 26 August 2026. For the latest information on Australian Government law please go to https://www.legislation.gov.au.